Engineering

Sweetwater Authority is proud to provide water to the thriving South County community. We continually look for ways to better serve the community, including ways to partner with developers to build the infrastructure needed to keep South County vibrant. 

In February 2020, the Governing Board adopted Resolution 20-04, which established guidelines for staff communication with developer customers to ensure the best possible service.

  1. 1. Starting Your Project
  2. 2. Design Review
  3. 3. Construction of Water Facilities
  4. 4. Payment Reconciliation Process

The Developer (owner or authorized agent to act on behalf of the owner) shall submit project information on the Start Project tab. The typical project submittal, review, approval and construction process is provided in the Authority’s Water Service Application Guide (PDF). 

The design, review, and approval process for a project shall typically be processed as follows:

  1. Developer presents project location and information such as a Required Agency Clearance Form, Mapping, Grading, Street improvement, Building or Fire Protection plans, or a defined scope of work (e.g. moving a service lateral, adding an additional water service to serve existing irrigation or an existing second unit). Following submittal of the project information, an Authority technician is assigned to the Developer’s project. 
  2. Project submittals are preferred to be provided to the Authority in Adobe PDF. The Authority will provide a Sendit, large e-file transfer request to the Developer. Hard copies of project submittals are not acceptable.
  3. Depending on the type and size of the project, a Design Requirement Form (Design Requirement Form Example 1 (PDF), Design Requirement Form Example 2 (PDF), and Design Requirement Form Example 3 (PDF)), which provides the Developer’s acknowledgement of the Authority’s design requirements, and includes a fee/deposit to cover Authority review and processing efforts. Please see the Developer Checklist (PDF) for the Authority’s engineering department’s typical design review deposit requirements. 
  4. Payment for the design review can be made by cash, up to $2,000, check payable to “Sweetwater Authority” or through the CardX on-line at the Developer Payment Portal. Appointments for payments in person are required.

Application for a new, upgrade, or modification to an existing water service from Sweetwater Authority (Authority) is required when:

  • Requesting the installation of a new water meter and service lateral.
  • Remodel or additional square footage to a home, business, or other building.
  • Constructing single family dwellings, multi-unit apartments, and structures.
  • Requesting abandonment, modification or relocation of an existing water meter.
  • Adding an Accessory Dwelling Unit (ADU) or additional residential units.
  • Changing water use type (e.g. irrigation, domestic, fire protection).
  • Changing business type (for commercial accounts, e.g. retail to restaurant, etc.).
  • Constructing tenant improvements.
  • Adding fire protection.